Fuel and system
Result
–h
- Target sulphur at boundary –
- Total mixing volume –
- Flow through the system –
- Start changeover before boundary –
- Start changeover at –
Change temperature slowly and follow the engine maker's limit on the rate of temperature change and minimum viscosity at the engine inlet. Record the changeover in the log.
Guide only. Always check against your ship's manuals, tank tables, the BDN and your company procedures.
How it is worked out
- Compliant fuel flows into the mixing tank as fuel is burnt, so the sulphur falls step by step, not in a straight line.
- The calculator uses the standard full-mixing model: sulphur falls exponentially with the volume burnt.
- Add a margin for sampling, mixing that is not perfect and delays. Many companies start an hour or more earlier than the result.
Formula
Q = consumption (t/h) × 1000 / density [m³/h]
V = tank + piping volume [m³]
St = ECA limit − safety margin
t = (V / Q) × ln((S_HFO − S_LS) / (St − S_LS))
The target must be higher than the sulphur in the compliant fuel, or the changeover can never finish.
Learn the main engine properly
Book 1: The Main Engine — how it works, what goes wrong and how to fix it, with exam questions and a video lesson for every chapter.